> REFERENCE > Basel
 
Willbe Solution consists of an executive committee and employees with over 10 years of working experiences in financial industry and financial solution field. We provide the best 《Financial consulting and implementation service》 for domestic financial environment with our advanced financial techniques. We guarantee the provision of the most suitable strategy and implementation method in the financial industrial field for environmental analysis, strategy establishment, and utilization.
For effective capital management, integrated model, which supports required data for market, credit, and operational risk management system, is designed. The model works concurrently with EDW to build data and based on the built data, integrated risk data warehouse is built in a way that guarantees consistency and integrity of data management. The risk data warehouse provides data through integrated model such as Basel I, II, and internal models.

Please refer to below successful project results of Willbe Solution to picture the success of your firm in the future.
Kwang-ju/Kyung-nam bank new BIS system build project : RDM Interface
2006.08
Aa a part of Basel II project of Woori Financial Group, Basel consulting results of Woori Bank in base. 
After Building the new BIS systems of single unit of group integrated viewpoint, Woori bank, 
Kyung-nam bank, kwang-ju bank Will be able to build the respectively report. Kyung-nam bank and 
Kwang-ju bank about source system will be accomplished BaselI I Standard to be derive 
improvement and data interface as group integrated model of standard.
Ausust.2006 ~ June.2007
Standard of Basel II Kyung-nam bank and infra improvement consulting of Kwang-ju bank.
Group(Kyung-nam bank and Kwang-ju bank)model maintenance support can be able to reflect a 
infra character.
Building Data quality management system of group model viewpoint in Kyung-nam bank and Kwang-ju bank.
Efficient interface process for massive data and process maintenance for re-work.
Verification of load data and backup process maintenance.
For building system of Basel Ⅱ, the main issue was quality of data that system
could be supported and Improve on the source of data about data and quality 
management.
As building quality management of data, improve quality of data to data infra.
Improve single view about customer information and management process of lifecycle. 
Increase management efficiency according to process automation of interface.  
Prove work results and guarantee transparency of data process as building report system.  
Improve single view of data interface throughout full management of scattered risk data.
Reconsider IT investment efficiency throughout supporting Integrated model.
Hana Bank Basel II Project RDM Project
2006.03
Under Basel II of Hana bank, the project for the capital maintenance which is efficient market and trust,
will be able to support the necessary data of operation risk management system and the model which 
is integrated confronts constructs the appropriation gold production system of the forecast loss 
standard for to construct the integrated base Risk Data Mart for in base data support, Pillar II capital 
propriety and hereafter Ministry of Financial Supervisory Commission policy of plans and Risk 
Component production supports and Fermat CAD Basel II packages.
March.2006 ~ December.2006
Basel II and data provision of the integrated model base for Risk management system in compliance 
with an internal model The process improvement program for the data security which is integrated 
and systematic security 
The data provision to which the integrity, consistency and timely characteristic are guaranteed 
The model security which is easy in data analysis 
Connection plan and security of contiguity system and Information mart 
After service/frequency information system 
Reserve for bad debts/economic capital maintenance system
The necessary data which market, trust and operation risk is unified
The management effectiveness augmentation which follows in interface process automation 
Verification work result, with screen data control systematic transparency security  
The data interface unification systematic maintenance which leads Risk Data concentration 
managements which are dispersed 
IT investment effectiveness raising which lead Risk Data integrated model embodiments of the bank
Korea Exchange Bank, Basel II RDW Building
2005.11
The measurement way Korea Exchange Bank Over the world carrying out an agreement with new 
Basel in expectation was subdivided into the existent BIS rate and risk management
November.2005 ~ Februalry.2007
Basic data integration and risk DW construction for credit risk measurement 
Basic data integration and risk DW construction for market measurement
Basic data integration and risk DW construction for operation risk measurement
KEB was built a system to manage all data integration for risk calculation in
the construction RDW
Basic data for credit risk 
Basic data for market risk 
Basic data for operation risk
Shin-Han Financial Group Basel II Project RDM Building
2005.04
Basel II of Shin-Han Financial Group Project is built a system to be integrated with financial group 
based on data of risk data mart that efficiently practical use of capital , a healthy asset, 
foreign credit was purposed with efficient internal control within financial group
April.2005 ~ March.2006
Data integration model to risk data mart before Shin-Han Bank and Cho-hung Bank 
Integration, interface planning with Shin-Han Card Corporate of group viewpoint.
Integration data modeling with analyzing package on interface request
Efficient interface to Massive data and re work for process 
Load data verification and back up process
As being a system with integration model to Risk Data Mart, before integration of 
Shin-Han Bank, credit contribution information provided to the same people.
Interface process automation 
Data interface in singleness with Concentration management of Scattered risk data 
Group integration model
  1   
 
 

customer relationship management